|
- 语言编码 : 英文
- 软件版本 : sm400
- 资源类型 : 韩国原厂技术通告
- 非VIP会员请直接到三星贴片机综合讨论专区发帖提问。
- VIP用户可以直接联系技术支持QQ获取在线技术支持。
- 技术支持QQ:1504561681
- 开通VIP
Procedures required when replacing old SBC with SM400 series mass pro7 J8 F7 _+ O3 }. L
duction SBC.
% d/ q: j* k/ C1 y- {1. Backup MMI fold of the existing equipment into D or E drive.
, z7 Z8 x7 Z7 w7 u3 y2. Disconnect old SBC from rack.! W4 S( M( C0 A" K$ b! p% i
3. Disconnect cooler and memory from old SBC.8 X' ?4 j: j' q" f; ?
4. Install new CPU at new SBC and assemble cooler disconnected from the existing SBC.* y, p; O1 R! R [
(Never use Intel Cooler included in the box CPU because of weak durability.)
4 l8 P1 j, S, T- g8 {5 C! u0 F5. Mount the memory disconnected from old SBC.
9 ~ G$ c; ^$ _6 x7 b6. Assemble SBC at rack and install the supplied Com Port bracket, if the facility uses IT,
. r! Y% t) `2 ~0 ]9 ~ {+ L3 `and connect it to SBC Com Port Connector.0 d; y. L" \ B# g2 {
7. Receive SM400 Series XP Embedded SP3 ISO file from KT Hard, built Recovery DVD, and6 v$ d/ i& p n3 M
then install only OS at C drive of hard disk.) P6 d' e* p; U" W+ \5 G- c2 t2 q( Q
8. After a completion of Recovery and PnP process, reboot again and install MMI.
4 J) B9 b% b4 O; w4 T9. Overwrite system/PCB folder of back-up MMI into C:\SmartMMI.
9 b4 r0 u3 s' s( n" W10. Required Materials4 {- [ j; z, _+ \
2 A% l. A. F. y; j' u$ B
4 U& |* z' q- K; O7 F% _& L
|
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?立即加入
x
|