|
- 语言编码 : 英文
- 软件版本 : sm400
- 资源类型 : 韩国原厂技术通告
- 非VIP会员请直接到三星贴片机综合讨论专区发帖提问。
- VIP用户可以直接联系技术支持QQ获取在线技术支持。
- 技术支持QQ:1504561681
- 开通VIP
Procedures required when replacing old SBC with SM400 series mass pro. @4 W3 g, h# T: z1 ?* x1 u0 o
duction SBC.: [% v' P7 W+ c
1. Backup MMI fold of the existing equipment into D or E drive.0 Z3 Z4 P. U1 B5 E8 m$ C
2. Disconnect old SBC from rack.$ \/ } W5 ~* x* H- l1 W
3. Disconnect cooler and memory from old SBC.
, u0 I" ]' ~& _4. Install new CPU at new SBC and assemble cooler disconnected from the existing SBC.
! q- F7 ?0 F: Q4 A(Never use Intel Cooler included in the box CPU because of weak durability.)( O" I) ~4 S/ O; |% d. W+ o# h- f
5. Mount the memory disconnected from old SBC.
- @$ _$ U9 u0 S0 I9 M6. Assemble SBC at rack and install the supplied Com Port bracket, if the facility uses IT,
2 E5 S7 ?( Q& R5 J% y5 Eand connect it to SBC Com Port Connector." ?! B# m9 c& b& E; [5 P5 _
7. Receive SM400 Series XP Embedded SP3 ISO file from KT Hard, built Recovery DVD, and
7 E% _$ p. E- I z) v! b( Vthen install only OS at C drive of hard disk.
4 e2 t- k: U' R3 G& y8 X- A8. After a completion of Recovery and PnP process, reboot again and install MMI.. Y# m/ |% T1 x; C$ [/ w
9. Overwrite system/PCB folder of back-up MMI into C:\SmartMMI.6 ]6 I {7 x; w+ ]' _. i
10. Required Materials/ J0 @& K. H$ l% O) G+ N, _1 b; T
2 T" _" m. i+ z) }4 ?' d
: O# U$ S2 g2 d+ F z, O |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?立即加入
x
|