|
- 语言编码 : 英文
- 软件版本 : sm400
- 资源类型 : 韩国原厂技术通告
- 非VIP会员请直接到三星贴片机综合讨论专区发帖提问。
- VIP用户可以直接联系技术支持QQ获取在线技术支持。
- 技术支持QQ:1504561681
- 开通VIP
Procedures required when replacing old SBC with SM400 series mass pro
% {5 g# B, e y/ t6 g$ s, _$ y+ Wduction SBC.2 g+ o, B5 j3 I _ z+ v% D
1. Backup MMI fold of the existing equipment into D or E drive.
. m y" K. d+ D5 L0 k3 P4 i2. Disconnect old SBC from rack.0 ]# _- `: s8 T/ G7 L
3. Disconnect cooler and memory from old SBC.
7 t: D; ]! c7 u" s4. Install new CPU at new SBC and assemble cooler disconnected from the existing SBC.
) ` n6 v$ \* F# f! q+ h! P. S- `. L(Never use Intel Cooler included in the box CPU because of weak durability.)
' C" q) ?3 M# a8 b$ n+ R5. Mount the memory disconnected from old SBC.
" H. G! t2 o# J1 b: s6. Assemble SBC at rack and install the supplied Com Port bracket, if the facility uses IT,0 C: x5 V5 a+ v* w J- A* j) j
and connect it to SBC Com Port Connector., T0 X9 c3 a3 F/ \ H
7. Receive SM400 Series XP Embedded SP3 ISO file from KT Hard, built Recovery DVD, and5 a1 r0 S3 }+ o7 T, C- L& E+ ~
then install only OS at C drive of hard disk.
9 a- e# q ~/ t+ }2 Q( I! ~3 s8. After a completion of Recovery and PnP process, reboot again and install MMI.
- s+ o& A% z3 N9 t) s9. Overwrite system/PCB folder of back-up MMI into C:\SmartMMI.% \0 _$ W9 d6 J; g& G0 | h8 I' @8 ]
10. Required Materials
5 I/ e5 W; D, P6 b5 K; E
8 g. P8 X) [/ D$ T) b$ O) X& }7 {6 r$ t, e: ^- Y/ P; o
|
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?立即加入
x
|